A crack in the deck plating of a vessel may be temporarily prevented from increasing in length by___________.
A.
cutting a square notch at each end of the crack
B.
drilling a hole at each end of the crack
C.
slot-welding the crack
D.
welding a doubler over the crack
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
皮皮学刷刷变学霸
举一反三
【简答题】Refer to Table 6-1. If the government creates a price ceiling which is $100 below the equilibrium price, the new market price is_______, and _______ two-bedroom apartments will be rented.
【简答题】Refer to Table 6-1. If the government creates a price ceiling which is $100 below the equilibrium price, the market price is_______, and _______ two-bedroom apartments will be rented.
【简答题】Refer to Table 6-1. If the government creates a price ceiling which is $100 below the equilibrium price, the market price is_______, and _______ two-bedroom apartments will be rented.