【简答题】用loc与ilo方法提取多列数据(如:no,name或name,class)
【单选题】In designing the Verrazano Bridge, Othmar Ammann ___.
A.
had time account the Curvature of the earth's surface
B.
spent over a year building the platforms that the bridge's base''
C.
had to consider the number of vehicles that might cross the bridge
D.
wished to reduce the size of the bridge as much as possible
【单选题】The Verrazano Bridge was built with so wide a span because__.
A.
it had to cover a wide stretch of water
B.
of the unusual shape of the earth around Brooklyn and Stands Island
C.
the water that lies between Brooklyn and Stands Island
D.
the number of wires in each cable is so great
【单选题】The Verrazano Bridge______ Brooklyn with Staten Island.
【判断题】国标中摩擦色牢度分五级,登记越高,表示牢度越好。
【单选题】The Verrazano Bridge _____ Brooklyn with Staten Island. (l.8)
【简答题】The Verrazano Bridge, which was by Othmar Ammann, joins Brooklyn to Staten Island. It has a span of 4260 feet. The bridge is so long that the shape of the earth had to be taken into account by its des...
【单选题】The Verrazano Bridge,_______________the design of Othmar Ammann.
【单选题】The Verrazano Bridge, _____ the design of Othmar Ammann. (l.8)