皮皮学,免费搜题
登录
搜题
【简答题】
阅读理解。 In today's throw-away society, dealing with the city's growing mountain of waste is an increasing challenge for the city council (市议会). Recently, Edinburgh is faced with the problem of disposing of (处理) about 250,000 million tons of waste a year. Despite different ways to dispose of much of it in a green manner - largely through encouraging recycling-its aging facilities such as the Powderhall landfill do not have the ability to deal with it. The European Union (EU) has issued a new policy, regulating how such mountains of waste are to be disposed of. The five councils ( Edinburgh, East Lothian, West Lothian, Midlothian and Borders ) face fines around £18 million a year from 2013 if they don't increase recycling levels and rely less on landfill. With this in mind, the councils got together with the idea of building a large incinerator plant (垃圾焚烧 厂) to burn half of the waste produced in their districts. But this plan fell apart after the change of target levels by a new UK government waste policy which required that no more than 25% of the city's waste should be disposed of in this way by 2025. After the plan was abandoned, a private company which already transported millions of tons of the city's waste by train to a landfill site near Dunbar, offered an alternative solution when it suggested opening a huge waste site near Portobello. Since Powderhall is supposed to close in 2015, it seemed necessary for the members of the Edinburgh Council to accept the suggestion. But soon they turned it down - after 700 local objections reached them - because it would have meant hundreds of lorries a day making loud noise through heavily populated areas. That still leaves the council with a problem. By 2013, only 50% of 1995 levels of waste will be allowed to be sent to landfill. Even if recycling targets are met, there will still be a large amount of rubbish to be burnt up. Due to this, Edinburgh and Midlothian councils have now decided to work together to build an incinerator plant as time to find a solution is fast running out. 1. The main way of handling waste in a green manner in Edinburgh is ________. A. recycling B. restoring C. burying D. burning 2. The five councils worked out a plan to build an incinerator plant to ________. A. reduce the cost of burying waste B. meet the EU requirements C. speed up waste recycling D. replace landfill sites 3. The city council of Edinburgh rejected the suggestion to open a huge landfill site near Portobello because ________. A. it came from a private company B. the council was not interested in it C. it was not supported by EU D. the local people were against it 4. What is the final decision of Edinburgh and Midlothian Councils? A. To open a new landfill nearby. B. To close the Powderhall landfill in 2015. C. To set up a plan for burning waste. D. To persuade people to deduce their waste.
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】股骨属于( )
A.
不规则骨
B.
短骨
C.
扁骨
D.
长骨
E.
以上都不对
【多选题】在物流客户服务绩效评价标准中,对订单执行的考科主要包括()
A.
订单及时率
B.
订单完整率
C.
订单履行的准确率
D.
订单处理率
【单选题】病人,女性,55岁。反复咳嗽、咳痰10年余,最近2天因劳累后心悸、气促。人院时有明显发绀,呼吸困难。护士应协助病人取
A.
半坐卧位
B.
平卧位
C.
侧卧位
D.
头高足低位
E.
头低足高位
【多选题】矿山工程项目现场管理工作的重点应当是()
A.
制度管理
B.
现场技术管理
C.
重大安全隐患管理
D.
其他管理
E.
检查和考核
【单选题】股骨属于( )
A.
长管状骨
B.
扁骨
C.
不规则骨
D.
短管状骨
E.
以上都是
【单选题】以下JavaScript数组定义错误的是?
A.
var txt = new Array("1","2","3");
B.
var txt = newArray(1,2,3);
C.
var txt = new Array[1,2,3];
D.
var txt = [1,2,3];
【单选题】有如下语句序列; int k=0 do{k+=5couk<<'$') while(k<19); while(k-->0)cout<<'*'; 执行上面的语句序列输出字符$和。的个数分别是
A.
4和20
B.
5和20
C.
4和21
D.
5和21
【单选题】有如下语句序列: int k=0 do{k+=5 cout<<'$'} while(k<19) while(k--0>0)cout<<'*' 执行上面的语句序列输出字符$和*的个数分别是
A.
4和20
B.
55和20
C.
4和21
D.
5和21
【单选题】以下JavaScript定义一个数组错误的方法是( )。
A.
var food = new Array();
B.
var foods = new Array(”西红柿”,”青椒”,”西葫芦”);
C.
var foods = [”西红柿”,”青椒”,”西葫芦”];
D.
var foods = (”西红柿”,”青椒”,”西葫芦”);
【单选题】有如下语句序列: int k=0: d0{k+=5;cout<<‘$’;} while(k<19); while(k-->0)cout<<‘*’; 执行上面:的语句序列输出字符“$”和“*”的个数分别是( )。
A.
4和20
B.
5和20
C.
4和21
D.
5和21
相关题目: