皮皮学,免费搜题
登录
搜题
【简答题】
America’s greatest technological achievement, the Hoover Dam, now has a companion piece, a bridge held up by the longest arch in the Western Hemisphere(半球). The Mike O’Callaghan-Pat Tillman Memorial Bridge, which opened this month and connects the U.S. states of Arizona and Nevada, crosses the vast chasm(峡谷)890 feet above the Colorado River that is controlled by the dam. The striking 1,900-foot-long structure will improve traffic in the region and help protect the dam from being destroyed. It is the seventh highest bridge in the world, behind four in China, one in Papua New Guinea and one in the US state of Colorado. “The Hoover Dam is the greatest civil engineering achievement in America’s history,” said the bridge project manager Dave Zanatell. “Our goal was not to outdo or outshine it. Our goal was to, in a respectful way, do something that would be great for our generation and that would stand besides Hoover Dam in a respectful and quality way that would become a part of Hoover’s legacy(遗产).” Just as the Hoover Dam was built in the heart of the Great Depression(大萧条)and was seen as an example of the nation’s can-do spirit, some hope this project can also provide some uplift . The bridge is surprising: at 1,050 feet, its support arch holds up a roadway that lies on 300-foot-long concrete pillars(柱子), some of the tallest in the world. It contains 16 million pounds of steel. The idea of the bridge came into being in the 1960s because the top of the Hoover Dam has been a narrow two-lane road that is the fastest route from Arizona to Las Vegas and then the Pacific Northwest and Canada. Access to the dam from each direction is a dangerously winding route, but massive trucks and passenger vehicles shared it for decades. During the day, when thousands of tourists travel to the dam from Las Vegas three times as many accidents as on a normal road will happen. The bridge has a sidewalk on the side facing the dam. The wall on both sides is 54 inches high, so walkers can take photos there. 小题1:Which of the following is true of the Hoover Dam? A.It was completed recently. B.It was built during the hard times. C.It has the longest arch. D.It’s the seventh highest dam in the world. 小题2:What is one of the purposes of building the bridge? A.To protect the dam. B.To save the cultures. C.To outdo the dam. D.To develop the tourism. 小题3:The underlined word “uplift” in Paragraph 4 means _____. A.lift of the heavy object B.support in money C.spiritual encouragement D.instruction in technology 小题4:Which of the followings shows the right position of the bridge and dam? 小题5:The text is mainly about ______. A.the Hoover Dam B.American western development C.a tour along the Colorado River D.a recently built bridge
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】劳动可分为体力劳动和脑力劳动,其所依据的分类标准是______
A.
有否劳动报酬
B.
劳动的二重性
C.
劳动对象
D.
消耗体力还是脑力
【单选题】广告:是指为了商业目的,由商品经营者或服务者承担费用,通过一定媒介或一定形式,如通过报刊、电视、路牌、橱窗等,直接或间接地对自己推销的商品或提供的服务所进行的公开的宣传活动。根据以上定义,下列属于广告活动的是( )。
A.
健力宝集团赞助中国体育代表团出征奥运会,获得良好的社会效应和经济效益
B.
老师规定学生考试一定要用钢笔
C.
某药厂厂长为更好地销售他们厂生产的药物,向医院负责购买药物的主任送礼10万元
D.
小布什为了当总统,不惜花费巨资在电视上和报刊上发表演说
【单选题】广告:指为了商业目的,由商品经营者或服务提供者承担费用,通过一定媒介或一定形式,如通过报刊、电视等,直接或间接地对自己推销的商品或者所提供的服务所进行的公开的宣传活动。 根据上述定义,下列属于广告活动的是( )。
A.
水泥厂的厂长为了更好地销售水泥,向邻县的包工头送礼一百万
B.
小布什为了当总统,不惜重金在电视上和报刊上发表演说
C.
李宁牌服装赞助中国体育代表团出征奥运,获得良好的社会效应和经济效应
D.
老师规定学生考试一定要用圆珠笔
【简答题】现在是下午4:00钟,Cindy Schultz,一个公司总经理,已经工作快一整天了。她感觉很疲倦,决定先休憩15分钟,然后参加4:15的经理人员会议。目前,她的公司今次那个了流程再造和其他的变革,这需要大量的新颖的管理思想。当她靠在椅背上时,她在思考管理科学理论是否能够指导公司的变革。当她进入梦乡时,她梦见自己坐上了时光穿梭机,回到了管理历史发展的通道上。 情景问题之一:Cindy拜访...
【简答题】n. 体力劳动者
【判断题】数据库管理系统经历了20多年的发展演变,已经取得了辉煌的成就,发展成了一门内容丰富的学科。
A.
正确
B.
错误
【单选题】下列( )不是保健食品服用的目的是。
A.
促进健康
B.
治疗疾病
C.
恢复健康
D.
辅助治病
【单选题】下列( )不是保健食品服用的目的是。
A.
促进健康
B.
治疗疾病
C.
康复健康
D.
辅助治病
【单选题】What is the little dish?
A.
It's a kind of spice.
B.
It's a place for the food.
C.
It's a dish for the soy sauce.
【单选题】不是保健食品服用的目的是( )。
A.
促进健康
B.
治疗疾病
C.
康复健康
D.
辅助治病
相关题目: