【单选题】The critical path in a network is the path that:
A.
Has the greatest degree of risk.
B.
Will elongate the project if the activities on this path take longer than anticipated.
C.
Must be completed before all other paths.
【单选题】● The critical path in a network is the path that: A Has the greatest degree of risk. B Will elongate the project if the activities on this path take longer than anticipated.
C.
Must be completed before all other paths.
【单选题】● The critical path in a schedule network is the path that:
A.
Takes the longest time to complete
B.
Must be done before any other tasks
C.
Allows some flexibility in scheduling a start time.
D.
Is not affected by schedule slippage
【单选题】求图示电路中电流源的电压【图片】。【图片】
【单选题】Which of the following choices correctly describes the difference between a data load via the conventional path and the direct path?()
A.
One runs faster than the other
B.
A conventional path data load bypasses most of the Oracle RDBMS, whereas a direct path load is a high-speed version of the SQL INSERT
C.
A direct path data load bypasses most of the Oracle RDBMS, whereas a conventional path load is a high-speed version of the SQL INSERT
D.
The conventional path runs when the CONVENTIONAL command-line parameter is set to TRUE
【单选题】求图示电路中电流源的电压【图片】。【图片】