皮皮学,免费搜题
登录
搜题
【单选题】
You are the network administrator for TestKing.com. All network servers run Windows Server 2003. The network includes a file server named Testking1. Testking1 contains a single disk for system files and two SCSI hard disks that comprise a 72-GB mirrored volume with 65 GB of read-only data. Users connect to this data by using shortcuts on their desktops. Testking1 is scheduled for replacement. You have a scheduled maintenance window to complete this task. Before the maintenance window, you build a new server. You need to bring the new server online with current data and re-establish redundancy as quickly as possible. You must also ensure that the desktop shortcuts will continue to function. What should you do?()
A.
Name the new server Testking1. Create a new mirrored volume by using two 72-GB disks. Connect Testking2 to the network and copy the data from Testking1. When copying is complete, shut down the old Testking1.
B.
Name the new server Testking1. Move both disks from the old Testking1 to the new Testking1. Scan the disks for changes. Import the disks.Connect the new Testking1 to the network.
C.
Name the new server Testking1. Break the mirror on the old Testking1. Move one of the disks from the old Testking1 to the new Testking1. Scan the disk for changes. Initialize the disk. Select the spare disk and create the mirror. Connect the new Testking1 to the network.
D.
Name the new server Testking1. Remove one of the disks in the mirror from the old Testking1. Move the disk on the new Testking1. Scan the disk for changes. Import the disk, Shut down the old Testking1 and connect the new Testking1 to the network.
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【简答题】打电话:hablar ______ ______
【单选题】下面程序的运行结果是 . #include void main() { int s=0,i=1; while (s<=10) { s=s+i*i; i++; } printf("%d",--i); }
A.
4
B.
3
C.
5
D.
6
【简答题】背景 某市新建小区雨水管线工程,直径1500mm,长1320m,管顶覆土约4.8m。采用钢筋混凝土管,水泥砂浆抹带接口,90°混凝土基础;施工范围土质为硬塑的轻粉质黏土,无需降低地下水。由于场地狭小,无法采用机械开挖,项目部决定采用人工开挖:分两层开挖,每层2.4m;开挖断面为梯形槽,采用坡度板控制槽底高程和坡度。开挖出的土方直接堆放在沟槽两侧0.5~2.Om的范围内,高度不超过2.4m。项目部推...
【简答题】某市新建小区雨水管线工程,直径1500mm,长1320m,管顶覆土约4.8m。采用钢筋混凝土管,水泥砂浆抹带接口,90°混凝土基础;施工范围土质为硬塑的轻粉质黏土,无需降低地下水。由于场地狭小,无法采用机械开挖,项目部决定采用人工开挖:分两层开挖,每层2.4m;开挖断面为梯形槽,采用坡度板控制槽底高程和坡度。开挖出的土方直接堆放在沟槽两侧0.5~2.Om的范围内,高度不超过2.4m。项目部推行绿色...
【单选题】下面程序的运行结果是 . #include void main() { int s=0,i=1; while (s<=10) { s=s+i*i; i++; } printf("%d",--i); }
A.
4
B.
3
C.
5
D.
6
【简答题】某市新建小区雨水管线工程,直径1500mm,长1320m,管顶覆土约4.8m。采用钢筋混凝土管,水泥砂浆抹带接口,90°混凝土基础;施工范围土质为硬塑的轻粉质黏土,无须降低地下水。由于场地狭小,无法采用机械开挖,项目部决定采用人工开挖:分两层开挖,每层2.4m;开挖断面为梯形槽,采用坡度板控制槽底高程和坡度。开挖出的土方直接堆放在沟槽两侧0.5~2.0m的范围内,高度不超过2.4m。项目部推行绿色...
【简答题】背景某市新建小区雨水管线工程,直径1500mm,长1320m,管顶覆土约4.8m。采用钢筋混凝土管,水泥砂浆抹带接口,90°混凝土基础;施工范围土质为硬塑的轻粉质黏土,无需降低地下水。由于场地狭小,无法采用机械开挖,项目部决定采用人工开挖:分两层开挖,每层2.4m;开挖断面为梯形槽,采用坡度板控制槽底高程和坡度。开挖出的土方直接堆放在沟槽两侧0.5~2.0m的范围内,高度不超过2.4m。项目部推行...
【单选题】下面程序的运行结果是: I=5 J=10 K=20 M=-10 IF(I.GT.M)M=I IF(J.GT.M)M=J IF(K.GT.M)M=K WRITE(*,*)M END
A.
5
B.
10
C.
20
D.
-10
【多选题】下面哪些应有绿色施工内容
A.
施工许可证
B.
施工组织设计
C.
施工方案
D.
会计账本
E.
工程技术交底
【单选题】下列立直反射中不能持续终生的是
A.
躯干立直反射
B.
视性立直反射
C.
颈立直反射
D.
迷路性立直反射
相关题目: