An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access. What preparation for moving the rack will result in the least disruption to end-users?()
A.
Initiate LPAR fallover to backup systems.
B.
Use Live Partition Mobility to move the LPARs to other systems.
C.
Use Live Application Mobility to move critical applications to alternate systems.
D.
Back up all LPARS to a NIM server and restore them to other LPARs on other systems.