皮皮学,免费搜题
登录
搜题
【简答题】
阅读理解。 The tower of Big Ben, London's most famous building, has always leaned (倾斜) slightly, but construction work on a new line for the London Underground seemed likely to give the tower a real lean. Engineers have had to prop up (支撑) its base to prevent it from damaging the rest of the Houses of Parliament. To control the tower's movement,engineers pumped grout (水泥浆) into the soil under the tower. The tower not leans an extra few centimeters, but the lean can only be seen by the most sharp-eyed observer. Between 1995 and 1997, to lengthen the Jubilee line of the Underground, builders dug a 40-metre-deep hole just 31 metres north of the clock tower. And the new tube (underground ) tunnels were even nearer to the tower. John Burland, who recently helped stop the increasing lean in the Leaning Tower of Pisa and was an adviser to the Jubilee line project, believed the work would affect the tower. In his opinion,no further lean should go beyond a safety limit of 27.5 millimetres over the existing lean of 220 millimetres. To keep the lean within this limit,Burland told the British Association about the new method of pumping grout immediately unde the base of the tower.More than 300 tons of grout were pumped in during construction.The tower's additional lean went between 10 and 25 millimetres,but never passed 27.5 millimetres. After the construction work was completed in last 1997, a review of movements in nearby walls showed that the building was in better shape than had been thought before and the safety limit was raised to 35 millimetres before any action needs to be taken. Since 1997,the tower had continued to lean, Burland told Modern Constuction.The latest measurements,taken this year,suggest that the tower's lean had just reached 35 millimetres.But following regular re-examinations of the tower,experts are sure that the tower has stabilised(稳定). A spokesman for London Underground says: 'We understand the tower has stabilised and retuned to its normal movement cycle.' From Modern Construction, 16 September 2000 1. Which of the following drawings correctly shows how the propping up construction was carried out? 2. What does the word ' review '(in Paragraph 5) mean? A. Observation B. Description C. Discussion D. Re-examination 3. Why was the propping up construction necessary? A. To stop the tower of Big Ben from leaning B. To stop sharp-eyed people from seeing the lean C. To stop the Tower Pisa from leaning too much D. To stop the clock tower from leaning beyond its safety limit 4. What was the existing lean of the tower at the time when the article was written? A. 220 millimetres B. 255 millimetres C. 35 millimetres D. 27.5 millimetres 5. We can infer from the article that _____. A. the tower of Big Ben will damage the Houses of Parliament B. the Jubilee line should be stopped in Burland's opinion C. the writer is blaming Burland for making a mistake D. the propping up work has proved to be successful
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【简答题】阅读下面诗歌,完成下面两 题。 赠刘景文 苏轼 荷尽已无擎雨盖,菊残犹有傲霜枝。 一年好景君须记,最是橙黄橘绿时。
【简答题】利用程序实现计算机动画 , 题目自选: 参考题目 1 、运行的汽车 2 、跳动的小球 3 、工作的时钟 4 、飘动的红旗 5 、闪烁的星星 ...............
【判断题】"荷尽已无擎雨盖,菊残犹有傲霜枝。一年好景君须记,最是橙黄橘绿时。"前两句是对偶,写荷与菊的姿态及旺盛的生命力。后两句提醒"君"不要忘记美景,诗中所说"一年好景"指春天景色。
A.
正确
B.
错误
【单选题】以下哪项权利,是在《侵权责任法》中第一次作为独立的权利加以保护的?
A.
隐私权
B.
健康权
C.
生命权
D.
发现权
【单选题】正值秋日。下列诗句不是描写秋天的是:
A.
绿池落尽红蕖却,荷叶犹开最小钱
B.
一年好景君须记,最是橙黄橘绿时
C.
停车坐爱枫林晚,霜叶红于二月花
D.
寒塘十里草茵茵,料必东君昨夜巡
【判断题】无限大功率电源 供电情况下突然发生三相短路时,短路电流中的周期分量不衰减,非周期分量也不衰减。( )
A.
正确
B.
错误
【单选题】某工程按国务院规定于2014年6月1日办理了开工报告审批手续,报经批准的开工日期为6月3日,由于周边关系协调问题一直没有开工,同年12月7日准备开工时,建设单位应当()。
A.
向批准机关申请延续
B.
报批准机关核验开工报告
C.
重新办理开工报告审批手续
D.
改办施工许可证
【判断题】应付账款属于负债类科目,而制造费用属于成本类科目。
A.
正确
B.
错误
【简答题】一年好景君须记,最是橙 橘 时。
【单选题】一年好景君须记,( )。
A.
最是橙黄橘绿时
B.
最是红橙黄绿时
C.
最是黄橙橘绿时
D.
最是红黄橘绿时
相关题目: