皮皮学,免费搜题
登录
搜题
【简答题】
CET4 Reading Cloze1 In this section, there is a passage with ten blanks. You are required to select one word for each blank from a list of choices given in a word bank following the passage. Read the passage through carefully before making your choices. Each choice in the bank is identified by a letter. You may not use any of the words in the bank more than once. An office tower on Miller Street in Manchester is completely covered in solar panels. They are used to create some of the energy used by the insurance company inside. When the tower was first 1 in 1962, it was covered with thin square stones. These small square stones became a problem for the building and continued to fall off the face for 40 years until a major renovation was 2 . During this renovation the building's owners, CIS, 3 the solar panel company, Solarcentury. They agreed to cover the entire building in solar panels. In 2004, the completed CIS tower became Europe's largest 4 of vertical solar panels. A vertical solar project on such a large 5 has never been repeated since. Covering a skyscraper with solar panels had never been done before, and the CIS tower was chosen as one of the "10 best green energy projects". For a long time after this renovation project, it was the tallest building in the United Kingdom, but it was 6 overtaken by the Millbank Tower. Green buildings like this aren't 7 cost-efficient for the investor, but it does produce much less pollution than that caused by energy 8 through fossil fuels. As solar panels get 9 , the world is likely to see more skyscrapers covered in solar panels, collecting energy much like trees do. Imagine a world where building the tallest skyscraper wasn't a race of 10 , but rather one to collect the most solar energy. A. 1 B. 2 C. 3 D. 4 E. 5 F. 6 G. 7 H. 8 I. 9 J. 10
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】服务蓝图被三条线分成四个部分,自上而下分别 是 、前台员工行为、后台员工行为以及支持过程。
A.
服务需求
B.
顾客行为
C.
战略目标
D.
竞争环境
【单选题】在建设工程项目管理的基本概念中,“进度目标”对业主而言是项目( )的时间目标。
A.
竣工
B.
调试
C.
试生产
D.
动用
【简答题】工程项目管理的基本概念是什么?包括哪些内容?
【单选题】食蚜蝇可以取食______。
A.
蚜虫    
B.
瓢虫  
C.
介壳虫  
D.
粉虱
【多选题】下列企业名称中()是音译的?
A.
壳牌
B.
香奈儿
C.
百事可乐
D.
范思哲
【单选题】在建设工程项目管理的基本概念中,“进度目标”对业主而言是项目( )的时间目标。
A.
动用
B.
竣工
C.
调试
D.
试生产
【判断题】猪类按血统分为地方型、引进型和改良型等。A. 对 B. 错
A.
正确
B.
错误
【单选题】在建设工程项目管理的基本概念中,“进度目标”对业主而言是项目( )
A.
动 用
B.
竣 工
C.
调 试
D.
试生产
【单选题】在建设工程项目管理的基本概念中,“进度目标”对业主而言是(     )的时间目标
A.
竣工
B.
调试
C.
试生产
D.
动用
【单选题】食蚜蝇可以取食( )。 A. 蚜虫 B. 瓢虫 C. 介壳虫 D. 粉虱
A.
蚜虫
B.
瓢虫
C.
介壳虫
D.
粉虱
相关题目: