The washwoman was very old, as could be seen from the wrinkles in her face and the way she had to struggle to carry her big bundle of laundry. But 1 her aging body, her spirit was still strong. Year after year, she 2 the struggle of washing other people's laundry. She was very 3 and always did a good job, although she 4 no more than the others. She had a rich son, but she 5 not ask him for help. She did not want to be a 6 to anyone. When she 7 ill, it seemed as though we might never see her again. She did not 8 with the laundry, and we were worried that she might have died. However, she finally appeared, tottering under a very heavy bundle. As she sat in the kitchen, she drank a hot cup of tea and explained how she had managed to finish this job. The laundry was not her 9 , but she felt a duty to finish her work. She was so 10 that she felt the wash would not let her die. 请从下面的词库中选择答案。答案必须为单词前面的大写字母,填小写字母或单词不得分。如第一题如果应该填入wrinkles ,那么答案应该填 A 。 A, wrinkles B,laundry C.worried D.despite E. return F. should G.after H.property I.endured J.faithful K.reliable L.charged M.would N.burden O.fell
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】()中国关税税率降到发展中国家的平均水平以下,平均关税税率降至10%左右。
A.
2003年
B.
2004年
C.
2005年
D.
2006年
【单选题】压电式传感器是一种典型的( )传感器。
A.
自发电式
B.
红外线
C.
磁场
D.
电场
【单选题】建设工程项目进度控制的经济措施包括( )。
A.
优化项目设计方案
B.
分析和论证项目进度目标
C.
编制资源需求计划
D.
选择项目承发包模式
【多选题】建设工程项目进度控制的经济措施包括()。
A.
经济激励措施
B.
承发包模式的选择
C.
资金需求分析
D.
编制项目进度控制的工作流程
E.
资金供应的条件分析
【判断题】到2005年,中国关税税率降到发展中国家的平均水平以下,平均关税税率降至10%左右。()
A.
正确
B.
错误
【单选题】某企业期末应交所得税额为67500元,该企业期末计提所得税应编制的会计分录为
A.
借:所得税费用67500 贷:应交税费-应交所得税67500
B.
借:应交税费-应交所得税67500 贷:银行存款67500
C.
借:本年利润67500 贷:所得税费用67500
D.
借:所得税费用67500 贷:本年利润67500
【单选题】某企业期末应交所得税额为 67 500 元,则该企业期末结转所得税费用应编制的会计分录为
A.
借:所得税费用 67 500 贷:应交税费 — 应交所得税 67 500
B.
借:应交税费 — 应交所得税 67 500 贷:银行存款 67 500
C.
借:本年利润 67 500 贷:所得税费用 67 500
D.
借:所得税费用 67 500 贷:本年利润 67 500
【判断题】金融监管的重要性,与金融业的特殊性相联系。 ( )
A.
正确
B.
错误
【判断题】中国关税税率降到发展中国家的平均水平以下,平均关税税率降至10%左右是在2005年,。()
A.
正确
B.
错误
【多选题】建设工程项目进度控制的经济措施包括( )。
A.
经济激励措施
B.
工程进度的风险分析
C.
资金需求分析
D.
编制项目进度控制的工作流程
E.
资金供应的条件