Which of the following conditions cannot change the railway transportation contract ( ) A. Violate of national laws, administrative regulations, material flow or transportation restrictions; B. The changed transit period limit is longer than the permitted transit period limit of the goods; C. The second change of the arrival station; D. change part of a batch of goods; E. The consignee proposes to change the contract