根据课文内容选择,回答问题,在问题的回答中填入正确的信息(单词或短语) 1. Why did the parents generally refuse to give their children Christmas presents? The parents 1) ______________________ (could/ couldn't) afford to give the children expensive presents, so they would buy presents 2)_________________(before/during/ after) Christmas at a reduced price. 2. In what way did other parents deceive (欺骗) their children? Other children's parents told them that their presents were left by Santa Claus and made in the North Pole. In fact, the presents were made in 3)________________(Japan/ UK /US) and left by the 4)______________ (parents/Santa Claus/ grant parents). 3. Why did they celebrate Christmas about a week later? They celebrated Christmas about a week later, because at that time they could get Christmas trees, wrapping paper, decorations, and presents more 5)_________________ (cheaply/expensively), or even 6)___________________. 4. Why did they go to the desert to see the stars? They went to see the stars because the father wanted to“give”each child a star or planet. He said that these were their 7)_____________________. 5. In what way is Venus different from Betelgeuse and Rigel? Betelgeuse and Rigel are 8)_________________, while Venus is a 9)__________________, not a star. Venus is smaller than a star and doesn't make its own 10)_______________. 6. What advantages did the stars have over traditional Christmas presents? The stars last much longer than 11)______________. The father says that when the toys are all broken and 12)______________________, the stars will still exist.
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】流水强度反映的工程量是指
A.
某一施工过程(专业工作队)在单位时间内所完成的
B.
某一施工过程(专业工作队)在计划期内所完成的
C.
整个建设工程在计划期内单位时间所完成的
D.
整个建设工程在计划期内投入的多种资源量所完成的
【单选题】流水强度反映的工程量是指( )工程量。
A.
某施工过程(专业工作队)在计划期内所完成的
B.
整个建设工程在计划期内单位时间所完成的
C.
整个建设工程在计划期内投入的多种资源量所完成的
D.
某施工过程(专业工作队)在单位时间内所完成的
【简答题】按照北京市建委发布的标准,将住宅分为普通住宅和非普通住宅,普通住宅是指( )。
【单选题】当使用下列命令配置了路由器后,将有多少地址可用于进行动态NAT转换()
A.
7
B.
8
C.
9
D.
10
【单选题】流水强度反映的工程量是指(  )工程量
A.
某施工过程(专业工作队)在单位时间内所完成的
B.
某施工过程(专业工作队)在计划期内所完成的
C.
整个建设工程在计划期内单位时间所完成的
D.
整个建设工程在计划期内投入的多种资源量所完成的
【单选题】当使用下列命令配置了路由器后,将有多少地址可用于进行动态NAT转换? Router(config)#ip nat pool TAME 209.165.201.23 209.165.201.30 netmask 255.255.255.224 Router(config)#ip nat inside source list 9 pool TAME
A.
7
B.
8
C.
9
D.
10
【单选题】当使用下列命令配置了路由器后,将有多少地址可用于进行动态NAT转换?
A.
uter(config)#ip nat pool TAME 209.165.201.23 209.165.201.30 netmask 255.255.255.224
B.
uter(config)#ip nat inside source list 9 pool TAME
C.
7
D.
8
E.
9
F.
10
【单选题】绿色施工是指工程建设中,在保证质量、安全等基本要求的前提下,通过科学管理和技术进步,最大限度地节约资源与减少对环境负面影响的施工活动,实现四节一环保,下列哪项不属于“四节”的内容
A.
节约资金
B.
节能
C.
节地
D.
节材
【单选题】下列人群中,最响亮的捍卫中间等级的思想和权利的是()。
A.
老中产阶级
B.
服务型职员集团
C.
参与管理型职员
D.
知识分子
【单选题】草地生态学为生态学的分枝学科,属于( )的范畴,它以生物学,地学和普通生态学为基础,为草地畜牧业及自然资源的管理和环境保护提供草地生态学的基础理论和相应技术。
A.
理论生态学
B.
应用生态学
C.
农业生态学
D.
景观生态学
相关题目: