皮皮学,免费搜题
登录
搜题
【简答题】
在班级本课程实验分组中,你属于哪个小队?
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】可单独使用,从下图梁的截面图中可以确定梁的抗扭钢筋的根数是 。
A.
1
B.
2
C.
3
D.
4
【单选题】The General Agreement on Tariffs and Trade and the World Trade Organization have resulted in
A.
termination of export subsidies applied to manufactured goods.
B.
termination of import tariffs applied to manufactures.
C.
termination of import tariffs applied to agricultural commodities.
D.
termination of international theft of copyrights.
E.
a number of rounds of multilateral trade agreements.
【单选题】可单独使用,从下图梁的截面图中可以确定梁的抗扭钢筋的根数是 。【图片】
A.
1
B.
2
C.
3
D.
4
【单选题】Consider Figure 2.2. With trade, Canada consumes: Figure 2.2 illustrates trade data for Canada. The figure assumes that Canada attains international trade equilibrium at point C. Figure 2.2. Canadian ...
A.
12 televisions and 8 refrigerators
B.
12 televisions and 16 refrigerators
C.
8 televisions and 16 refrigerators
D.
24 refrigerators
【单选题】试验测定厌氧菌药敏状况,培养基应选用
A.
BAP
B.
KVLB
C.
BBE
D.
EYA
E.
PEA
【单选题】The World Trade Organization evolved from which of the following? A) Mercosur B) General Agreement on Tariffs and Trade C) Truman Doctrine D) Marshall Plan
A.
Mercosur
B.
General Agreement on Tariffs and Trade
C.
Truman Doctrine
D.
Marshall Plan
【简答题】general trade
【单选题】甲公司2015年12月31日取得某项机器设备,原价为2000万元(不含增值税),预计使用年限为10年,预计净残值为0,会计处理时按照年限平均法计提折旧;税法处理时允许采用加速折旧法计提折旧,甲公司在计税时对该项资产采用双倍余额递减法计提折旧,税法和会计估计的预计使用年限、净残值相同。计提了两年的折旧后,2017年12月31日,甲公司对该项固定资产计提了160万元的固定资产减值准备。2017年12月...
A.
0
B.
1440
C.
160
D.
1280
【单选题】Consider Figure 2.2. In the absence of trade, Canada would produce and consume: Figure 2.2 illustrates trade data for Canada. The figure assumes that Canada attains international trade equilibrium at ...
A.
8 televisions and 16 refrigerators
B.
12 televisions and 16 refrigerators
C.
8 televisions and 12 refrigerators
D.
12 televisions and 8 refrigerators
【单选题】叠合梁施工流程正确的是()。答案是:
A.
支撑体系搭设→叠合梁吊具及辅助施工机具安装→叠合梁吊运及就位→叠合梁节点连接→叠合梁安装及校正→叠合梁面层钢筋绑扎及验收→叠合梁节点及面层混凝土浇筑→叠合梁支撑体系拆除
B.
支撑体系搭设→叠合梁吊具及辅助施工机具安装→叠合梁吊运及就位→叠合梁安装及校正→叠合梁面层钢筋绑扎及验收→叠合梁节点连接→叠合梁节点及面层混凝土浇筑→叠合梁支撑体系拆除
C.
支撑体系搭设→叠合梁节点连接→叠合梁吊运及就位→叠合梁安装及校正→叠合梁吊具及辅助施工机具安装→叠合梁面层钢筋绑扎及验收→叠合梁节点及面层混凝土浇筑→叠合梁支撑体系拆除
D.
支撑体系搭设→叠合梁吊具及辅助施工机具安装→叠合梁吊运及就位→叠合梁安装及校正→叠合梁节点连接→叠合梁面层钢筋绑扎及验收→叠合梁节点及面层混凝土浇筑→叠合梁支撑体系拆除
相关题目: