【多选题】An administrator is unsuccessful in adding VLAN 50 to aswitch. While troubleshooting the problem, the administrator views the output of the show vtp status command, which is displayed in the graphic. ...
【多选题】Refer to the exhibit. Users from the Engineering VLAN complain that every time Business VLAN users have a network connectivity issue, the Engineering VLAN users usually have problems experiencing slow...
A.
Upgrade Spanning Tree Protocol to Rapid Spanning Tree Protocol.
B.
Change Business VLAN PCs to switch 1 and switch 4.
C.
Force the root bridge to be switch 2, instead.
D.
Adjust spanning-tree timers (max-age and forward-delay).
E.
Shut down all unused ports.
F.
Use MSTP to separate the Engineering VLAN from the Business VLAN to optimize spanning-tree convergence time within each VLAN.