皮皮学,免费搜题
登录
搜题
【判断题】
导致太平天国运动爆发的最主要原因是 封建主义与人民大众的矛盾。
A.
正确
B.
错误
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】Perez Company had the following information available: Expected Costs and Selling Price Based on 5,000 Units: Variable manufacturing costs per unit $32 Fixed manufacturing costs per u...
A.
$480,000
B.
$580,000
C.
$680,000
D.
$780,000
【判断题】在准备电动汽车场地时,只要以前测试过绝缘垫的绝缘阻值,一个月内都不要再次测量。
A.
正确
B.
错误
【判断题】The fixed costs in the flexible budget are the same as the planning budget because they do not change in response to changes in the activity level within the relevant range.
A.
正确
B.
错误
【单选题】Flat Company currently produces cardboard boxes in an automated process. Expected produc­tion per month is 40,000 units. The required direct materials cost $0.30 per unit. Manufacturing fixed overhe...
A.
$26,000 and $20,000
B.
$36,000 and $30,000
C.
$40,000 and $34,000
D.
$44,000 and $38,000
【判断题】(判断)在准备电动汽车场地时,只要以前测试过绝缘垫的绝缘阻值,一个月内都不要再次测量。( )
A.
正确
B.
错误
【判断题】The fixed overhead flexible-budget variance is the difference between actual fixed overhead costs and the fixed overhead costs in the flexible budget.
A.
正确
B.
错误
【单选题】Differences between the fixed budget and the flexible budget are due to____.
A.
problems of cost control
B.
poor usage of material and labour
C.
a combination of price and material variances
D.
actual activity differing from expected activity levels
【单选题】The static budget is based on the ________ level of output and the flexible budget is based on the ________ level of output.
A.
actual; expected
B.
expected; actual
C.
expected; planned
D.
actual; projected
【单选题】Jenny's Corporation manufactured 25,000 grooming kits for dogs during March (assume Jenny uses standard costing). The fixed overhead cost allocation rate is $20.00 per machine hour. Below is the fixed...
A.
$120,000
B.
$122,000
C.
$123,000
D.
$125,000
【单选题】Differences between the budget and the flexible budget are due to:
A.
problems of cost control
B.
poor usage of material and labor
C.
a combination of price and material variances
D.
d. actual activity differing from expected activity levels
相关题目: