【单选题】2013版清单计价规范规定,当工程变更导致该清单项目工程数量发生变化,若工程量增加()以上,增加部分的工程量的综合单价应予调低。
【单选题】Which is the large city in Scotland ?
【单选题】which is wrong about large artery:
A.
tunica intima is obviously see
B.
tunica media composed by elastic membrane
C.
have function for keeping the blood flow continously
D.
interal elastic membrane can obviously seen
E.
have function for maintaining blood pressure stability
【单选题】已标价工程量清单中有适用于变更工程项目的,应采用该项目的单价;担当工程变更导致该清单项目的工程数量发生变化,且工程量偏差超过()时,该项目单价应按照工程量偏差相关条款调整。
【判断题】任何解锁方式都必须满足“三点检查”的条件,进路才能解锁
【单选题】which is WRONG about large intestine:
B.
have no structure of villi
C.
goblet cells are more than small intestine
D.
glands are longer tha small intestine glands
【单选题】根据GB50500-2013清单计价规范9,3.1规定:已标价工程量清单中有适用于变更工程项目的,应采用该项目的单价;但当工程变更导致该清单项目的工程数量发生变化,且工程量偏差超过()%时,该项目单价可以调整。
【单选题】The house, which is large and is surrounded by trees and flowers, is what she longs for .
【简答题】单位负责人应当保证会计机构、会计人员依法履行职责。( )