【单选题】
The project has been going relatively well,although there have been some problems with resource availability and the project scope has changed more than was expected.The project is now completing one of its phase.Of all decisions the sponsor must consider during an end-of–phase review meeting,the MOST difficult is:
A.
Authorizing scope change for the next phase.
B.
Authorizing budget increase for the next phase based on scope changes.
C.
Cancelling the project.
D.
Decreasing scope to maintain the budget.
拍照语音搜题,微信中搜索"皮皮学"使用
参考答案:
参考解析:
知识点:
.
..
皮皮学刷刷变学霸
举一反三
【单选题】在纵坡设计中,转坡点桩号应设在()的整数倍桩号处。
A.
5m
B.
10m
C.
20m
D.
5.0m
【简答题】泄水孔台前位置的标高为( )。
【单选题】在纵坡设计中,转坡点桩号应设在( )的整数倍桩号处。
A.
5m
B.
10m
C.
15m
D.
20m
【单选题】在纵坡设计中,转坡点桩号应设在( )的整数倍桩号处。
A.
5m
B.
10m
C.
20m
D.
25m
【简答题】调速阀是由( )与节流阀串联而成的组合阀。
【单选题】当 , 是等价无穷小,则k=
A.
0
B.
1
C.
2
D.
3
【简答题】印刷工艺包括不同的印刷方式和覆膜、烫金、烫银、压凹凸、UV等 () 。
【判断题】异步电动机异步二字的由来,是因为定子磁场转速和转子转速之间不同步.
A.
正确
B.
错误
【单选题】挖基坑土方工程量计算:图纸说明如下 a 设计室内外高差 450mm ,土壤为二类土,地下水位在距地面 5 米下,土方堆放在距现场 50m 的地方,回填土取土距离为坑边。 b 现浇混凝土标号:垫层为 C15 砾石混凝土,基础、梁、柱为 C25 砾石混凝土,其余均为 C20 砾石混凝土,混凝土均为现场搅拌。 上图中基础土方开挖工程量是( )
A.
2.69
B.
25.01
C.
20.15
D.
21.50
【单选题】当 时, 与 是等价无穷小,则k=( )
A.
0
B.
1
C.
2
D.
3
相关题目: